24/7 ON CALL · 2 HR RESPONSE QBCC 1143420 · Cm3 Prequalified · FPA Australia Member Tenders & Prequalification Client Portal Service@SafeQLD.com.auEmail Us (07) 3286 6310
Home / Who We Help / Industrial & Cold Storage

Industrial & Cold Storage Fire Protection

For industrial property funds and their facilities managers, logistics and food operators, and head contractors building new cold stores across South East Queensland. Safe QLD Fire Protection designs, installs, commissions and maintains sprinklers, fire pumps, hydrants, aspirating detection and EWIS to AS 1851-2012, with emergency lighting to AS/NZS 2293.2 and portables on the same attendance, in temperature-controlled, high-risk environments.

Cold Chain AwareCm3 Prequalified13-Building Cold Storage Site24/7 On Call, 2 Hour Response
Cold Storage & Warehousing

High racking, low temperatures and a fire load that moves every day

Cold storage is one of the hardest environments in the industry to protect. Sub-zero temperatures rule out standard water-filled sprinkler pipework, high-bay racking changes how smoke behaves, and conventional detectors struggle where air movement is constant. These sites need a contractor who has worked in them before, and for new cold stores our engineering, design and installation team holds the fire scope from drawings to commissioning.

What we maintain on industrial sites

  • Sprinkler systems including dry pipe systems (AS 1851-2012 Section 2, AS 2118)
  • Fire pumpsets and water storage tanks, with pumpset performance testing on calibrated gauges (AS 1851-2012 Sections 3 and 5, AS 2941)
  • Fire hydrants and boosters, flow and pressure tested with every gauge verified (AS 1851-2012 Section 4, AS 2419.1)
  • Fire detection, alarm and EWIS across freezer, chiller and dock zones (AS 1851-2012 Section 6, AS 1670.1)
  • VESDA and aspirating detection tuned for cold, high air movement environments, including transport time testing
  • On the same attendance: emergency and exit lighting across large floor plates (AS/NZS 2293.2), hose reels and portable extinguishers (AS 2444)
  • Passive fire protection to plant rooms, penetrations and fire-rated separations
AS 1851-2012AS 2118AS 2941AS 2419.1AS 1670.1AS/NZS 2293.2NCC
Sprinkler valve sets with pressure gauges, flow switches and manual release stations in a plant enclosure
Working Around Your Operation

We plan the work around the cold chain, not the other way around

Cold Chain Protected

Testing staged zone by zone with doors kept closed, so temperature-sensitive stock is never put at risk.

Production Aware

Routines scheduled around shifts, dispatch windows and food-safety requirements in food-grade facilities.

Interface Coordination

Fire systems that interface with refrigeration plant and leak response procedures, coordinated with your refrigeration contractor before any isolation.

One Asset Register

Every device across every zone and every building on a single twelve month calendar, with a digital service report after every visit.

Representative Experience

Industrial and cold storage work across SEQ

The kind of industrial and temperature-controlled work our team is engaged for. Referee contacts are provided with tender submissions.

Cold stores and temperature-controlled warehousing

Standard Universal Group, Morningside: a 13-building cold storage site with multiple fire indicator panels, aspirating detection, sprinklers and pumps maintained with the cold chain protected, plus a new cold store fire indicator panel, sprinkler and aspirating detection project.

Port, logistics and warehouse estates

Heavy industrial projects and logistics sites in the Port of Brisbane precinct, including a 114-unit portable equipment estate for Silk Contract Logistics. Warehouse fire installations at Flagstone Logistics Estate (Lot 102, 90,000 sqm), ESR Stage 3 (Buildings 4 and 7) and Crestmead Business Park.

Staged works on live industrial sites

New builds and upgrades sequenced around dispatch, with isolations reinstated the same shift.

What a Procurement Team Gets

The evidence an evaluator asks for, before they ask

Prequalified and Insured

Cm3 prequalified, FPA Australia member, QBCC 1143420 and electrical contractor licence 1506841. $20M public and products liability, $10M professional indemnity and WorkCover Queensland, certificates of currency on request.

Evidence Every Visit

Digital service report and signed LB6A entry after every visit, photographed defects classified critical or non-critical, annual Certificate of Maintenance and an updated asset register.

Measurable Response

24/7 on call, 2 hour response Gold Coast to Sunshine Coast, critical defects notified within 4 hours, and a standing $500 minor works authority so small defects close on the day.

One Contract, One Calendar

A twelve month service calendar issued before the year starts, CPI-only escalation, and a client portal with unlimited users across every site in the portfolio.

Common Questions

Industrial and cold storage FAQs

Does freezing temperature affect fire detection and sprinklers?
Significantly. Standard water-filled sprinkler pipework cannot be used in freezer rooms, so dry or antifreeze systems are common, and detection must be chosen for the environment. Aspirating systems such as VESDA are widely used in cold rooms because conventional point detectors can be unreliable in low temperatures and high air movement.
How do you test fire systems without shutting down a cold chain?
We plan around production and cold chain integrity. Testing is staged zone by zone, doors are kept closed wherever possible, and work in freezer areas is scheduled and sequenced so temperature-sensitive stock is never put at risk.
What is the AS 1851 schedule for an industrial warehouse?
It depends on the systems installed. Sprinklers, fire pumpsets and hydrants each carry AS 1851-2012 routines out to five-yearly, detection and EWIS run monthly through annual routines, extinguishers and hose reels are inspected six-monthly, and emergency and exit lighting is discharge tested six-monthly under AS/NZS 2293.2. We map every asset onto one twelve month calendar so nothing is missed.
How do you work around refrigeration plant rooms?
Where fire systems interface with refrigeration plant or leak response procedures, we coordinate testing with your refrigeration contractor and site emergency procedures before any system is isolated.
Related Pages

Keep exploring

Running fire compliance across more than one site?

One agreement, one service calendar and one consolidated compliance record across the portfolio, with 24/7 cover and a two hour emergency response from the Gold Coast to the Sunshine Coast.

Enquire Here