For industrial property funds and their facilities managers, logistics and food operators, and head contractors building new cold stores across South East Queensland. Safe QLD Fire Protection designs, installs, commissions and maintains sprinklers, fire pumps, hydrants, aspirating detection and EWIS to AS 1851-2012, with emergency lighting to AS/NZS 2293.2 and portables on the same attendance, in temperature-controlled, high-risk environments.
Cold storage is one of the hardest environments in the industry to protect. Sub-zero temperatures rule out standard water-filled sprinkler pipework, high-bay racking changes how smoke behaves, and conventional detectors struggle where air movement is constant. These sites need a contractor who has worked in them before, and for new cold stores our engineering, design and installation team holds the fire scope from drawings to commissioning.

Testing staged zone by zone with doors kept closed, so temperature-sensitive stock is never put at risk.
Routines scheduled around shifts, dispatch windows and food-safety requirements in food-grade facilities.
Fire systems that interface with refrigeration plant and leak response procedures, coordinated with your refrigeration contractor before any isolation.
Every device across every zone and every building on a single twelve month calendar, with a digital service report after every visit.
The kind of industrial and temperature-controlled work our team is engaged for. Referee contacts are provided with tender submissions.
Standard Universal Group, Morningside: a 13-building cold storage site with multiple fire indicator panels, aspirating detection, sprinklers and pumps maintained with the cold chain protected, plus a new cold store fire indicator panel, sprinkler and aspirating detection project.
Heavy industrial projects and logistics sites in the Port of Brisbane precinct, including a 114-unit portable equipment estate for Silk Contract Logistics. Warehouse fire installations at Flagstone Logistics Estate (Lot 102, 90,000 sqm), ESR Stage 3 (Buildings 4 and 7) and Crestmead Business Park.
New builds and upgrades sequenced around dispatch, with isolations reinstated the same shift.
Cm3 prequalified, FPA Australia member, QBCC 1143420 and electrical contractor licence 1506841. $20M public and products liability, $10M professional indemnity and WorkCover Queensland, certificates of currency on request.
Digital service report and signed LB6A entry after every visit, photographed defects classified critical or non-critical, annual Certificate of Maintenance and an updated asset register.
24/7 on call, 2 hour response Gold Coast to Sunshine Coast, critical defects notified within 4 hours, and a standing $500 minor works authority so small defects close on the day.
A twelve month service calendar issued before the year starts, CPI-only escalation, and a client portal with unlimited users across every site in the portfolio.
Sprinkler systems for high-bay warehouses and freezer zones, designed and installed to AS 2118, commissioned and maintained under AS 1851.
View the serviceOne agreement, one twelve month calendar and consolidated compliance records across every building on the estate.
View maintenance contractsDesign, install, commission and maintain, with design, drafting, project management, installation, commissioning and service in house.
Read the capability statementOne agreement, one service calendar and one consolidated compliance record across the portfolio, with 24/7 cover and a two hour emergency response from the Gold Coast to the Sunshine Coast.