24/7 ON CALL QBCC Licence 1143420 · CM3 Prequalified Careers: Apply Here Client Portal Service@SafeQLD.com.auEmail Us (07) 3286 6310
Home / Compliance / Schedule Builder

What Does Your Building Actually Need?

Tick the fire systems in your building and get the real AS 1851-2012 routine frequencies back, system by system. No sign-up, no email required, nothing leaves your browser. Built from the same standard our technicians work to on site.

AS 1851-2012 frequencies Queensland occupier obligations Free, no sign-up
Schedule Builder

Build your AS 1851 maintenance calendar

Most building managers inherit a fire maintenance contract without ever being shown what the standard actually requires. This lays it out plainly, so you can check what you are paying for against what AS 1851-2012 sets.

Why This Matters

Compliance is cumulative

The yearly routine builds on the six-monthly, which builds on the monthly. Skipping one leaves a gap in the record that an auditor, an insurer or a Queensland Fire Department officer will find. If a routine on your list has not been done, that is the conversation to have now rather than after an incident.

Baseline Data

Every AS 1851 test is a comparison against how the system performed when it was commissioned. Without baseline data nobody can say whether yours has quietly degraded.

Critical Defects

AS 1851 splits faults into critical and non-critical. A critical defect stops the system working in a fire and must be actioned immediately, not scheduled.

The Occupier Statement

It is not just signed and filed. Under section 55A it must be lodged with the Queensland Fire Department commissioner within 10 business days.

Licensed Work

Fire protection servicing in Queensland is licensed work. The technician's name and QBCC licence number must appear on the record.

Next Step

Want this priced against your actual building?

A schedule is a starting point. What it costs depends on how many devices, how the systems are configured and how the building runs. We quote from a site assessment, not an estimate over the phone.

Send us the schedule you just built

Your selected systems and quantities go through with this enquiry, so we can price against what is actually in your building instead of guessing.

What Happens Next

We read it before we reply

  • Your schedule lands with us exactly as you built it, system by system, with your quantities.
  • We check it against what the standard actually requires for your building class, not a generic template.
  • You get a written scope and price back, with anything we think you have been over-serviced or under-serviced on called out.
  • If a site assessment is needed to price it honestly, we say so rather than quoting blind.

Prefer to send documents? Email Service@SafeQLD.com.au with your asset register, last service report or drawings and we will work from those.

Is your building due for its AS 1851 fire service?

Fast response across South East Queensland. Clear digital reports. Audit-ready compliance.

Enquire Here