Major Fire Protection Maintenance Contracts Across SEQ

Whole-of-building and multi-site AS 1851 contracts under one agreement, one schedule and one record. Delivered by directly employed QBCC licensed technicians from the Gold Coast to the Sunshine Coast.

Whole-of-Building Agreements Multi-Site Portfolios Cm3 Prequalified 2 Hour SEQ Response
One Contractor, Whole Building

Stop Running Four Fire Contractors Across One Building

One maintenance agreement covering every fire safety asset on the site, in place of four contractors, four schedules and four report formats.

AS 1851-2012 AS 2118 Sprinklers AS 2419.1 Hydrants AS 1670 Detection & EWIS AS/NZS 2293.2 Emergency Lighting QBCC Licence 1143420 Cm3 Prequalified

Sprinklers, Pumps & Tanks

Whether pumped or un-pumped, Safe QLD has the equipment and expertise required to service your sprinkler systems, hose reels, hydrants and water tanks, including weekly and monthly pump routines and annual flow testing.

Fire Detection Panels & ASD

Monthly, six-monthly, annual and five-yearly routines on fire indicator panels, addressable detection, occupant warning, EWIS and aspirating smoke detection systems including VESDA.

Passive & Egress

Fire and smoke doors, penetration sealing, dampers, emergency and exit lighting discharge testing, so the containment and egress half of the building is held to the same schedule as the active systems.

Water Storage, Boosters & Hydrants

Fire water tanks, booster assemblies, ring mains and hydrant systems held on the same AS 1851 calendar as the sprinklers and pumps they feed, including annual flow and pressure testing and five-yearly overhaul.

Contract Grade

Backed by Depth, Licensing and Coverage

60+
Years Combined Experience
6
In-House Disciplines
24/7
Breakdown Cover
2hr
Response, Gold Coast to Sunshine Coast
The Detail

Scope, Service Levels and Transition

Open any panel for the full scope, method and schedules.

The full overview

Most large buildings end up with a sprinkler and pump company, a detection company, an emergency lighting company and someone else again for extinguishers and fire doors. Four schedules, four sets of site inductions, four reports written in four formats, and four contractors each pointing at the other when something fails an audit. Safe QLD replaces that with a single maintenance agreement covering every fire safety asset on the site.

With more than 60 years of combined experience across the leadership team, Safe QLD has delivered fire protection compliance across South East Queensland since 2008. Our in-house team designs, installs, commissions and maintains sprinklers, pumps, hydrants, detection, EWIS and emergency lighting. That in-house depth is what makes a genuine whole-of-building contract possible. Your sprinkler routines and your detection testing are carried out by our own licensed technicians, on our own schedule, under one set of records.

Built to Hold a Major Agreement, Not Just a Service Round
Fire hose reel carrying Safe QLD service labels with a dry chemical extinguisher sign beside it

Whole-of-Building Agreements

A whole-of-building contract puts every fire safety asset on the site under a single scope, a single schedule and a single point of accountability. When your annual occupier statement is due, the evidence for every system comes from one contractor with one continuous record, not four half-complete files.

  • Every fire system on the asset register under one scope of works
  • One AS 1851 calendar, so routines are bundled into fewer site visits
  • One induction, one set of site access arrangements, one crew you know
  • One consolidated compliance report covering the whole building
  • One accountable contractor at audit time, with nowhere to pass blame
  • Portables, passive and egress covered inside the same agreement

For a facility manager, property manager or asset owner, the practical difference is measured in hours of chasing that disappear from every month.

Fire hydrant booster assembly in its cabinet, with fire brigade inlets, a pressure gauge and an isolating valve

Multi-Site & Portfolio Contracts

Portfolios are where fragmented contracting really hurts. Different sites fall onto different schedules, asset registers are recorded differently at each address, and nobody can answer the simple question of whether the whole portfolio is compliant this quarter. Safe QLD runs multi-site agreements from one master schedule with consistent registers across every address.

  • One master AS 1851 schedule spanning every site in the portfolio
  • Consistent asset register structure and tagging at every address
  • Consolidated portfolio reporting alongside per-site compliance records
  • Defects tracked to closure across the portfolio, not lost site by site
  • One point of contact, one invoice structure, one escalation path
  • Coverage from the Gold Coast to the Sunshine Coast within a 2 hour response

We already hold this shape of work across water and utilities infrastructure, government and transport infrastructure, healthcare, cold storage, education, self storage, marine and strata residential portfolios. Our Seqwater arrangement alone runs to 39 water treatment plant and dam sites and 63 fire indicator panels, and the Standard Universal Group cold storage site at Morningside runs to 13 buildings on one schedule.

What a Safe QLD Maintenance Contract Includes

Every agreement is scoped to the building, but the backbone is the same on a single building or a portfolio spread across the region. These inclusions are what turn a maintenance contract from a series of visits into a defensible compliance position.

Baseline Asset Register

On the first visit we walk the building and register every asset, panel, pump, valve, detector, light, door and extinguisher, with location and condition captured so nothing is invisible for the life of the contract.

Full AS 1851 Schedule

Monthly, six-monthly, annual and five-yearly routines for every system mapped onto one calendar, bundled into as few site visits as the standard allows.

Digital Compliance Reporting

Every report records the asset, its location, the AS 1851 clause tested to and the actual reading, not a pass or fail tick. Reports are issued as PDF, held in the portal and exportable to CSV or Excel.

Defect Quoting With Photos

Defects are logged with photographs and a clear scope and price before any chargeable work starts, so you can budget and approve rather than be surprised by an invoice.

24/7 Breakdown Cover

Contract clients get 24/7 on call access with a 2 hour response from the Gold Coast to the Sunshine Coast when a pump fails, a panel goes into fault or a system trips out of service.

Occupier Statement Support

We assemble the annual maintenance evidence for every system we hold so the occupier can sign their statement on a complete, continuous record rather than a patchwork.

Free Client Portal Access

Contract clients get free access to the Safe QLD client portal, with reports, asset history, quotes and job status available on demand instead of by email request.

Named Technicians

A named primary technician and a named backup are assigned to your site, drawn from our own QBCC licensed technicians and in-house licensed electricians, so the people who know your building are the people who come back to it.

Service Levels We Put in Writing

The key performance indicators a contract is measured against, stated before you sign rather than discovered after.

Response and notification

  • 24/7 on call, every day of the year. Calls are answered by Safe QLD staff, not a call centre; after hours the head office number diverts to the rostered technician, who has a named backup.
  • On site within 2 hours for a critical impairment, Gold Coast to Sunshine Coast. Four hours for urgent faults where the system remains in a safe state, by agreement.
  • Critical defects notified within 4 hours of identification, with a proposed rectification in writing.
  • System impairments managed in writing: monitoring provider and Queensland Fire Department advised, interim measures recommended, and status reported until the system is back in service.

Reporting and review

  • Digital service report and signed LB6A logbook entry after every visit, held in your client portal. Reports record actual readings (hydrant flow and pressure, pump pressures, battery voltages, detector analogue values, sound pressure levels) and list any asset not tested with the reason.
  • A twelve-month service calendar issued in writing before the contract year starts; annual rounds scheduled at least eight weeks ahead.
  • Attendance performance against the 2 hour commitment reported, and an annual contract review covering compliance position, defect trends, response performance and the forward replacement programme.
  • An annual Certificate of Maintenance, an annual compliance statement and a condition and replacement report closing each contract year.
One Agreement Versus Juggling Four Specialists

The cost of multiple contractors is rarely on the invoice. It shows up in administration hours, in gaps between scopes that nobody owns, and in the audit where three of four reports are current and the fourth is nine months old.

What Matters Safe QLD Whole-of-Building Agreement Four Separate Specialist Contractors
Scheduling One AS 1851 calendar covering every system, routines bundled into fewer visits Four calendars drifting apart, overlapping and clashing site attendances
Asset register One register for the whole building, structured the same way at every site Four partial registers in four formats, with assets that appear on none of them
Compliance reporting One consolidated digital report per building, plus per-system detail Four report formats to collate, compare and store yourself
Scope gaps Single scope of works, so no asset falls between two contracts Boundary items such as pump room detection or damper actuators owned by nobody
Defect management Photographed, quoted and tracked to closure in one system Defects raised in four places, closed in none, repeated next visit
Breakdown response One 24/7 number, 2 hour response Gold Coast to Sunshine Coast Work out which contractor owns the fault before anyone is dispatched
Accountability at audit One contractor answerable for the building's compliance position Four contractors, each pointing at the other three
Site access and induction One induction, one set of keys and access permissions, familiar technicians Repeated inductions, escorts and access requests across four crews
Occupier statement Evidence assembled for you across every system before it falls due Chase four providers for missing records in the week it is due
Administration One agreement, one account manager, one predictable invoice structure Four contracts, four renewals, four invoicing cycles to reconcile
How We Take Over a Contract, Step by Step

1. Site Assessment

We attend the building with the right disciplines, hydraulic and detection together where needed, and assess what systems are actually installed rather than what the last contract said was installed.

2. Baseline Audit & Gap Report

Every asset is registered and compared against the AS 1851 routines that should have been performed. You receive an honest gap report of missed routines, untagged assets and open defects before we start.

3. Scope & Agreement

A written scope of works, schedule and price covering every system, with defect rectification separated out and quoted transparently so the contract price is not padded with guesswork.

4. Mobilisation

Inductions, access, keys, panel details and site contacts are set up once. Your schedule is loaded, portal access is issued, and the first routines are booked with your site contact.

5. Run & Report

Routines run to calendar, reports land in the portal, defects are quoted with photos, and 24/7 breakdown cover sits behind the whole agreement for the life of the contract.

Coming off an incumbent contractor mid-term? We can run the baseline audit and gap report before your current agreement expires, so you go to your board or committee with evidence rather than a hunch. Email Service@SafeQLD.com.au to book one.
Taking Over From an Incumbent Contractor
Addressable fire indicator panel with Safe QLD service label in an open outdoor enclosure

We Audit What Was Actually Tested, Not What Was Invoiced

Changing fire contractors is where hidden non-compliance surfaces. Buildings routinely turn out to have assets that were never on anyone's register, five-yearly routines that were quietly skipped, defects reported once and never mentioned again, and pump rooms that were signed off without a flow test in years.

  • Full physical asset register built from the building, not from inherited paperwork
  • Historical records reviewed against the routines AS 1851 requires for those systems
  • Missed, incomplete and undocumented routines identified and listed plainly
  • Open and repeat defects consolidated into one prioritised register
  • Untagged and unrecorded assets found, tagged and brought into the schedule
  • Service history and open defects migrated from the incumbent's platform into SimPro at handover, while the asset register itself is verified on site
  • A clear written position on where the building stands before we take responsibility

We report the gaps honestly, including the ones that are inconvenient. A contractor who tells you the building is perfect on day one is a contractor who has not looked, and you inherit that silence at your next audit.

Ready for Tender, Head Contractor Onboarding and Procurement

Major maintenance agreements are usually won through a tender, a panel arrangement or a head contractor onboarding portal, and they are lost on missing documentation as often as on price. Safe QLD holds the credentials and paperwork to clear that gate without delay.

Prequalification at a glance

Legal entitySafe QLD Pty Ltd (ACN 130 129 270), trading as Safe QLD Fire Protection. ABN 51 130 129 270. Established 2008.
LicencesQBCC contractor licence 1143420 (fire protection), current to 31 October 2027. Electrical contractor licence 1506841, current to 26 August 2027.
PrequalificationCm3 prequalified contractor (certificate 091153, current to 23 March 2027): WHS system, insurances and SWMS independently assessed. Member, FPA Australia.
Insurances$20M public and products liability, $10M professional indemnity and WorkCover Queensland. Certificates of currency supplied with every submission and on request.
WHS systemDocumented WHS management system of more than 180 controlled documents under revision control, task SWMS and JSA, monthly toolbox program, and a site-specific safety pack issued before commencement.
Field capacityDirectly employed, QBCC licensed technicians and apprentices with stocked service vehicles. Routine servicing is never subcontracted.
System of recordSimPro for asset registers, scheduling, test results, defects, quotes and reporting, with client portal access at no cost.
Technical submissionsScope statements written against AS 1851 routines by system, schedules of rates, asset register methodology and reporting samples, prepared by the people who do the work.

Our construction and major works capability sits behind the maintenance offer as six in-house disciplines: design and engineering, drafting and planning, project management and QA, specialist installation and programming, commissioning, and service and maintenance. That means a maintenance contract can absorb upgrade works, system replacements and large repairs without introducing another contractor to the site, and we coordinate directly with your fire engineers, hydraulic consultants and certifiers where a design change is involved.

Common Questions

Maintenance Contract FAQs

Can one contractor really maintain every fire system in a building?
Yes. Safe QLD holds a complete in-house team of industry experts and technicians covering sprinklers, fire pumps, hydrants, hose reels and tanks, fire detection and EWIS, emergency and exit lighting, passive fire and portable equipment. That means one agreement, one maintenance schedule and one consolidated compliance report rather than four contractors and four sets of paperwork. It also means boundary items (the pump room detector, the damper actuator, the panel that drives occupant warning) sit clearly inside somebody's scope.
Do you take on multi-site and portfolio maintenance agreements?
We do. Multi-site portfolios run under a single agreement with one master schedule, consistent asset registers across every site and consolidated reporting, so a facility manager can see the compliance position of the whole portfolio in one place rather than chasing individual site reports. Coverage runs from the Gold Coast to the Sunshine Coast within a 2 hour response, and we already hold this shape of work across water and utilities infrastructure, government and transport infrastructure, healthcare, cold storage, education, self storage, marine and strata residential portfolios, including 39 Seqwater water treatment plant and dam sites.
How do you handle transitioning from our current fire contractor?
We start with a baseline audit. Our technicians register every asset on site and compare what has actually been tested and recorded against what AS 1851 requires for those systems. You get an honest gap report showing missed routines, untagged assets and outstanding defects before your first scheduled service, so you know exactly what you have inherited and can prioritise rectification rather than discovering it at an audit.
Are you prequalified for tenders and head contractor onboarding?
Safe QLD is Cm3 prequalified (certificate 091153) and holds QBCC licence 1143420 and electrical contractor licence 1506841, with $20M public and products liability, $10M professional indemnity, WorkCover Queensland, SWMS and site-specific safety documentation available for tender submissions, head contractor onboarding portals, government and facilities management supplier panels, and body corporate procurement. Technical submissions are prepared by the people who perform the work, not by a bid team removed from site.
What is covered by the contract price and what is quoted separately?
Scheduled AS 1851 routines, compliance reporting and client portal access are covered by the agreement. Defect rectification, parts and any works outside the routine scope are quoted separately with photographs and a clear scope before we proceed, so nothing chargeable happens without your approval. Larger repair, upgrade and installation works can be delivered under the same agreement by our construction and project teams. Contract pricing is fixed for the year and adjusted once, on the anniversary, by CPI; there are no mid-year increases, fuel levies or admin surcharges. A twelve-month service calendar is issued before the year starts, a standing $500 minor works authority closes small defects on the day, an annual Certificate of Maintenance closes the year, and on termination the asset register, block plan and last service report are handed over within ten business days.
What happens when a system fails outside business hours?
Contract clients have 24/7 on call access. A failed fire pump, a panel in fault or a system isolated out of service is attended with a 2 hour response from the Gold Coast to the Sunshine Coast, by technicians who already hold your site details, panel information and access arrangements, which is where a single-contractor agreement pays for itself fastest.
What service levels do you commit to in a contract?
24/7 on call, with calls answered by Safe QLD staff rather than a call centre. On site within 2 hours for a critical impairment from the Gold Coast to the Sunshine Coast, and within four hours for urgent faults where the system remains in a safe state, by agreement. Critical defects are notified within 4 hours of identification with a proposed rectification in writing. Every visit ends with a digital service report and a signed LB6A logbook entry, attendance performance against the 2 hour commitment is reported, and an annual contract review covers compliance position, defect trends, response performance and the forward replacement programme.
Keep Exploring
What Our Clients Say

Rated 5.0 Across 28 Google Reviews

Facility managers, builders and building owners across South East Queensland who have put their compliance in our hands.

“Highly recommend Matt Anderson and his team at Safe Qld for their expertise in fire safety compliance. We have been using Safe Qld for several years for multiple commercial properties and their knowledge and service is second to none.”

Anne TuckerGoogle review, multiple commercial properties

“Extremely helpful and informative throughout the entire process!”

Google reviewPublished on our Google Business Profile

5.0 out of 5 from 28 reviews. Read every review on Google

Tendering a fire services package, or reviewing a maintenance contract?

Send the drawings, the asset register or the last audit report. You get a written scope, a price and our prequalification pack from the people who will do the work. QBCC 1143420, Cm3 prequalified, $20M public liability and $10M professional indemnity.

Enquire Here