24/7 ON CALL · 2 HR RESPONSE QBCC 1143420 · Cm3 Prequalified · FPA Australia Member Tenders & Prequalification Client Portal Service@SafeQLD.com.auEmail Us (07) 3286 6310
Home / Projects

Projects: Fire Detection, EWIS and Major Works

Sprinkler, fire pump, detection and engineered fire services on infrastructure, multi-site portfolios and occupied buildings across South East Queensland. The photographs are our own sites, installations and drawings. The clients and projects below are the scale we are built for.

QBCC Licence 1143420 Cm3 Prequalified Design, Install, Commission & Maintain
Recent Projects

Recent Projects

A selection of recent installation and upgrade projects, including work delivered by Safe QLD as principal contractor. To invite us to tender on a project, email Projects@SafeQLD.com.au.

Principal contractor · Residential

Stanhill Drive Residences

Surfers Paradise

High-end residential units, delivered by Safe QLD as principal contractor.

Principal contractor · Biomedical

Vaxxas Vaccine Facility

Specialist fire installation for a vaccine facility, delivered by Safe QLD as principal contractor.

Industrial and logistics

DHL Lawson, Brisbane Airport

Brisbane Airport

New fire detection system for a large logistics facility.

Industrial and logistics

ESR Warehouses 1 and 2, Gilmore Road

Berrinba

Fire detection, VESDA aspirating detection and brigade alarm signalling equipment (ASE) for a Green Star rated warehouse development.

Commercial and retail

Westside BMW

Ampac fire detection and occupant warning system for a car dealership showroom and workshop.

Clubs, community and health

Club Helensvale

Helensvale

New Ampac fire detection and EWIS for the club.

Clubs, community and health

Northcliffe Surf Life Saving Club

Surfers Paradise

Pertronic fire detection and EWIS for the surf club.

Clubs, community and health

Toowoomba Day Hospital

Toowoomba

Pertronic fire detection system.

Capability

What our work looks like up close

Evaluators ask for recent track record on the same or similar systems. Plenty of fire companies can change an extinguisher; fewer can program an addressable panel against a building's cause and effect matrix, design a pump and tank arrangement, or hand a certifier the documentation that closes a project out. The photographs below are our own work across detection, sprinklers, pumps, passive fire and engineered systems, and the tables further down name the clients and projects behind them.

Our Work

Systems, sites and drawings

Transport infrastructure

Tunnel fire indicator panel and station fire panel racks in a transport control room, alongside the plant control cabinets they interface with. Infrastructure of this type carries some of the most demanding cause and effect requirements we work with.

Addressable interface and cause and effect

Bank of Ampac addressable loop interface modules wired out in an environmental enclosure, with the cause and effect schedule worked through on site: fans start, fans stop, smoke mode. This is the part of a detection system that actually drives the building.

Hydrant boosters & valve assemblies

Fire hydrant booster assembly in its cabinet. Booster assemblies and hydrant pipework are inspected, pressure tested and flow tested under Section 4 of AS 1851-2012.

Addressable panel upgrades

Addressable fire indicator panel built out with expansion modules, installed and programmed in house. Panel replacements are staged so the building stays occupied and detection stays in service overnight.

In-house design and drafting

Three dimensional model of fire water storage tanks set against the building services layout, drafted in house. Design, drafting and project management sit under our own roof rather than being brokered out.

Fire services schematics

Fire services schematic produced in house for coordination with the fire engineer, consultant and certifier so the installed system matches the approved design intent.

Sprinkler pipework and valve sets

Sprinkler mains and valve sets inspected, flow tested and overhauled through the monthly to five-yearly routines in Section 2 of AS 1851-2012, on systems we design, install and commission to AS 2118.

Hydrants and hose reels

Fire hose reel and hydrant landing valve on a galvanised riser, part of the hydrant and hose reel assets we survey, flow test and overhaul across South East Queensland.

Passive fire and compartmentation

Fire door and exit signage in a commercial building. On portfolio and whole-of-building contracts, doors, penetrations and compartmentation are inspected to Section 12 of AS 1851-2012 and held on the same register and schedule as the active systems.

Sprinkler valve sets and manual release stations

Fire pump room: diesel pumpset and jockey pump

Panel build: main board, relay module and loop wiring

Fire water storage and pump house, Greater Brisbane Greyhound Centre

Penetration sealing in a riser

Labelled penetrations at Crestmead Business Park, each on the register

Marina hydrants

Aspirating smoke detection

Track Record

Clients and projects

Named clients and projects, by sector, scope and scale. Referee contacts are provided with tender submissions.

Infrastructure, portfolio and maintenance clients

Client or projectSectorScopeScale
SeqwaterWater utility, government-ownedFire services supplier arrangement: maintenance, five-yearly testing, fire system effectiveness audits, suppression testing, and fire indicator panel replacements with network cabling and reprogramming. Major installation at Ewen Maddock Dam.39 water treatment plant and dam sites, 63 fire indicator panels, maintenance and capital works
Standard Universal Group, MorningsideIndustrial cold storageWhole-of-site maintenance across multiple fire indicator panels, aspirating detection, sprinklers and pumps, plus a new cold store fire indicator panel, sprinkler and aspirating detection project13 buildings on one site
Unity Alliance, Cross River RailRail infrastructureRelocation of fire assets on the Cross River Rail projectCity rail project
Queensland Rail; Department of Transport and Main RoadsRail and state transportFire systems in a transport control environment for Queensland RailState rail and transport agency clients
Port of Brisbane precinctPort and heavy industrialHeavy industrial projects and logistics sitesMultiple logistics sites
Silk Contract Logistics, Port of BrisbaneLogisticsPortable equipment maintenance across the site estate114 units
Royal Queensland Yacht Squadron, ManlyMarine and clubAnnual maintenance of fire detection, hydrants and assets across the marina, reported asset by asset99-page asset-level service report

Installation projects

ProjectSectorScope
Rockhampton HospitalHealth (Queensland Health)Helipad fire deluge system
Building 17, RAAF Base AmberleyDefenceFire installation on a security-cleared site
Ripley Police StationGovernment (Queensland Police Service)Fire detection installation
Flagstone Logistics Estate, Lot 102LogisticsFire installation for a 90,000 sqm warehouse
ESR Stage 3, Buildings 4 and 7Industrial warehousingMulti-building warehouse fire installation
The Esplanade, Redland BayMulti-storey residentialFull fire detection and sprinkler installation
EQL ESITRAIN, Energex Training CentreEnergy utilityTechnical fire installation
Greater Brisbane Greyhound CentreSport and eventsFire installation for a racing and exhibition centre
Vaxxas vaccine facilityHealth and biomedical manufacturingSpecialist fire installation as principal contractor
Westside BMWCommercial dealershipRefurbishment and fire system upgrade
Prince of Peace auditoriumCommunity and educationAuditorium fire installation
Rosemount Retirement VillageAged careFire installation
Crestmead Business ParkIndustrial warehousingWarehouse fire installation and passive fire penetration works
Fire hydrant and sprinkler riser with valves, gauges and flow switch on a concrete plant room wall
Multi-Storey Residential

Hydrant and sprinkler risers in residential towers

A fire hydrant and sprinkler riser in the plant room of an apartment building: fire main valves secured open, pressure gauges, a flow switch and the hydrant landing valve. Risers like this carry hydrant and sprinkler water to every floor, so in an occupied tower they have to be tested, isolated and returned to service without leaving residents unprotected.

For strata schemes, community housing providers and agent-managed portfolios we hold whole-of-building maintenance: hydrant and sprinkler routines to Sections 2 and 4 of AS 1851-2012 on the same schedule as the detection, occupant warning, emergency lighting and fire doors, with panel replacements staged so the building stays occupied.

It is the type of building we are built for: multiple systems, one contractor, and a compliance record that has to survive the transition from construction into maintenance without a gap.

Strata & residential fire protection
Scale

The kind of work we take on

Major Installations

New sprinkler, hydrant, pump and detection installations designed, drafted, installed, commissioned and documented under one contract. Projects range from the Rockhampton Hospital helipad deluge system to a 90,000 sqm warehouse at Flagstone Logistics Estate.

Major Repairs and Replacements

Fire indicator panel replacements with network cabling and reprogramming, pump overhauls, ring main and booster rectification, five-yearly failures and end-of-life upgrades, scoped with photos and priorities.

Whole-Site Contracts

13 buildings at Standard Universal Group's Morningside cold storage site held under one AS 1851 schedule: multiple fire indicator panels, aspirating detection, sprinklers and pumps, with nothing in the gap between two contractors.

Portfolios

Seqwater: 39 water treatment plant and dam sites and 63 fire indicator panels, reported per site and across the portfolio, with five-yearly works flagged well before they land on the budget.

Next Step

Want the detail behind the photographs?

Our capability statement sets out licences, prequalification, insurances, disciplines, representative engagements, the standards we work to and who you deal with directly. It is the document to forward to a head contractor or a prequalification team.

Tendering a fire services package, or reviewing a maintenance contract?

Send the drawings, the asset register or the last audit report. You get a written scope, a price and our prequalification pack from the people who will do the work. QBCC 1143420, Cm3 prequalified, $20M public liability and $10M professional indemnity.

Enquire Here