Sprinkler, fire pump, detection and engineered fire services on infrastructure, multi-site portfolios and occupied buildings across South East Queensland. The photographs are our own sites, installations and drawings. The clients and projects below are the scale we are built for.
A selection of recent installation and upgrade projects, including work delivered by Safe QLD as principal contractor. To invite us to tender on a project, email Projects@SafeQLD.com.au.
High-end residential units, delivered by Safe QLD as principal contractor.
Specialist fire installation for a vaccine facility, delivered by Safe QLD as principal contractor.
New fire detection system for a large logistics facility.
Fire detection, VESDA aspirating detection and brigade alarm signalling equipment (ASE) for a Green Star rated warehouse development.
Ampac fire detection and occupant warning system for a car dealership showroom and workshop.
New Ampac fire detection and EWIS for the club.
Pertronic fire detection and EWIS for the surf club.
Pertronic fire detection system.
Evaluators ask for recent track record on the same or similar systems. Plenty of fire companies can change an extinguisher; fewer can program an addressable panel against a building's cause and effect matrix, design a pump and tank arrangement, or hand a certifier the documentation that closes a project out. The photographs below are our own work across detection, sprinklers, pumps, passive fire and engineered systems, and the tables further down name the clients and projects behind them.
Tunnel fire indicator panel and station fire panel racks in a transport control room, alongside the plant control cabinets they interface with. Infrastructure of this type carries some of the most demanding cause and effect requirements we work with.
Bank of Ampac addressable loop interface modules wired out in an environmental enclosure, with the cause and effect schedule worked through on site: fans start, fans stop, smoke mode. This is the part of a detection system that actually drives the building.
Fire hydrant booster assembly in its cabinet. Booster assemblies and hydrant pipework are inspected, pressure tested and flow tested under Section 4 of AS 1851-2012.
Addressable fire indicator panel built out with expansion modules, installed and programmed in house. Panel replacements are staged so the building stays occupied and detection stays in service overnight.
Three dimensional model of fire water storage tanks set against the building services layout, drafted in house. Design, drafting and project management sit under our own roof rather than being brokered out.
Fire services schematic produced in house for coordination with the fire engineer, consultant and certifier so the installed system matches the approved design intent.
Sprinkler mains and valve sets inspected, flow tested and overhauled through the monthly to five-yearly routines in Section 2 of AS 1851-2012, on systems we design, install and commission to AS 2118.
Fire hose reel and hydrant landing valve on a galvanised riser, part of the hydrant and hose reel assets we survey, flow test and overhaul across South East Queensland.
Fire door and exit signage in a commercial building. On portfolio and whole-of-building contracts, doors, penetrations and compartmentation are inspected to Section 12 of AS 1851-2012 and held on the same register and schedule as the active systems.
Named clients and projects, by sector, scope and scale. Referee contacts are provided with tender submissions.
| Client or project | Sector | Scope | Scale |
|---|---|---|---|
| Seqwater | Water utility, government-owned | Fire services supplier arrangement: maintenance, five-yearly testing, fire system effectiveness audits, suppression testing, and fire indicator panel replacements with network cabling and reprogramming. Major installation at Ewen Maddock Dam. | 39 water treatment plant and dam sites, 63 fire indicator panels, maintenance and capital works |
| Standard Universal Group, Morningside | Industrial cold storage | Whole-of-site maintenance across multiple fire indicator panels, aspirating detection, sprinklers and pumps, plus a new cold store fire indicator panel, sprinkler and aspirating detection project | 13 buildings on one site |
| Unity Alliance, Cross River Rail | Rail infrastructure | Relocation of fire assets on the Cross River Rail project | City rail project |
| Queensland Rail; Department of Transport and Main Roads | Rail and state transport | Fire systems in a transport control environment for Queensland Rail | State rail and transport agency clients |
| Port of Brisbane precinct | Port and heavy industrial | Heavy industrial projects and logistics sites | Multiple logistics sites |
| Silk Contract Logistics, Port of Brisbane | Logistics | Portable equipment maintenance across the site estate | 114 units |
| Royal Queensland Yacht Squadron, Manly | Marine and club | Annual maintenance of fire detection, hydrants and assets across the marina, reported asset by asset | 99-page asset-level service report |
| Project | Sector | Scope |
|---|---|---|
| Rockhampton Hospital | Health (Queensland Health) | Helipad fire deluge system |
| Building 17, RAAF Base Amberley | Defence | Fire installation on a security-cleared site |
| Ripley Police Station | Government (Queensland Police Service) | Fire detection installation |
| Flagstone Logistics Estate, Lot 102 | Logistics | Fire installation for a 90,000 sqm warehouse |
| ESR Stage 3, Buildings 4 and 7 | Industrial warehousing | Multi-building warehouse fire installation |
| The Esplanade, Redland Bay | Multi-storey residential | Full fire detection and sprinkler installation |
| EQL ESITRAIN, Energex Training Centre | Energy utility | Technical fire installation |
| Greater Brisbane Greyhound Centre | Sport and events | Fire installation for a racing and exhibition centre |
| Vaxxas vaccine facility | Health and biomedical manufacturing | Specialist fire installation as principal contractor |
| Westside BMW | Commercial dealership | Refurbishment and fire system upgrade |
| Prince of Peace auditorium | Community and education | Auditorium fire installation |
| Rosemount Retirement Village | Aged care | Fire installation |
| Crestmead Business Park | Industrial warehousing | Warehouse fire installation and passive fire penetration works |

A fire hydrant and sprinkler riser in the plant room of an apartment building: fire main valves secured open, pressure gauges, a flow switch and the hydrant landing valve. Risers like this carry hydrant and sprinkler water to every floor, so in an occupied tower they have to be tested, isolated and returned to service without leaving residents unprotected.
For strata schemes, community housing providers and agent-managed portfolios we hold whole-of-building maintenance: hydrant and sprinkler routines to Sections 2 and 4 of AS 1851-2012 on the same schedule as the detection, occupant warning, emergency lighting and fire doors, with panel replacements staged so the building stays occupied.
It is the type of building we are built for: multiple systems, one contractor, and a compliance record that has to survive the transition from construction into maintenance without a gap.
Strata & residential fire protectionNew sprinkler, hydrant, pump and detection installations designed, drafted, installed, commissioned and documented under one contract. Projects range from the Rockhampton Hospital helipad deluge system to a 90,000 sqm warehouse at Flagstone Logistics Estate.
Fire indicator panel replacements with network cabling and reprogramming, pump overhauls, ring main and booster rectification, five-yearly failures and end-of-life upgrades, scoped with photos and priorities.
13 buildings at Standard Universal Group's Morningside cold storage site held under one AS 1851 schedule: multiple fire indicator panels, aspirating detection, sprinklers and pumps, with nothing in the gap between two contractors.
Seqwater: 39 water treatment plant and dam sites and 63 fire indicator panels, reported per site and across the portfolio, with five-yearly works flagged well before they land on the budget.
Our capability statement sets out licences, prequalification, insurances, disciplines, representative engagements, the standards we work to and who you deal with directly. It is the document to forward to a head contractor or a prequalification team.
Send the drawings, the asset register or the last audit report. You get a written scope, a price and our prequalification pack from the people who will do the work. QBCC 1143420, Cm3 prequalified, $20M public liability and $10M professional indemnity.